FOLLOW US ON:
 

     OIL & GAS PROJECTS

     Design and supply of light fittings for

  • The GASCO New Safety Building – Bu Hasa
  • Process Building - Habshan
  • Non Process Building - Habshan
  • Non Process Building - Asab
  • ASAB Accommodation facilities Phase–1
  • Multipurpose Sports Hall at Bu Hasa .
  • Decorative light the new Masjid in GASCO– Habshan .
  • Power interconnection between GASCO RUWAIS AND TAKREER GUP.
  • Caravan Rooms – Bu Hasa
  • Car parking in Bab Plant
  • Car parking in Habshan Plant
  • Street Lighting - Bu Hasa
  • NPCC OGD III Civil works at Ruwais
  • Blast Proof building – Das Island.
  • Qatar Gas offshore platform at North field Bravio.

     Supply of Light fittings for

  • BOROGUE 2 TECNIMONT
  • Power systems for the ADNOC - FOD Stations.
  • ADNOC RUWAIS. Ruwais Refinery Filling Area – ADNOC
  • ADCO Heliport refueling facility ASAB
  • BOROUGE-2
  • GASCO Civil Works at Ruwais
  • ADNOC filling stations
  • Car Wash Area-.refinery work for TAKREER at Abu Dhabi
  • GASCO AGD II Camp and Temporary facilities at Asab
  • Replacement of Explosion proof Light Fixtures at the Fuel oil (ADNOC)
  • Steel Caravans GASCO Habshan

 

  PRIVATE DEVELOPERS AND COMMERICIAL PROJECTS

Supply of Light fittings for

  • The New Abu Dhabi Commercial Bank Building Al Wathba
  • Camel race track (VIP majlis)
  • European Business Centre Dubai
  • The Yas Island. YUP Project
  • Mussafah Work force
  • Shams Abu Dhabi on Al Reem Island
  • Sadiyat Island Power Distribution N-5072

Design and supply of light fittings for

  • The GHQ District Cooling Schemes
  • English School YASMIN
  • Saraya Development Work GCAA Abu Dhabi
  • Yas Island – Retails Malls
  • New Naboodah office – Abu Dhabi United Printing Press & Publishing
  • Press- Street Lighting New Naboodah office – Abu Dhabi
  • Emal Aluminium Smelter Project

ABU DHABI MUNICIPALITY PROJECTS

     Supply of Light Fittings for the

  • The TRIP Contract 237 for Municipality
  • The Sadiyat Express Way – 2569
  • The Saraya Development- Abu Dhabi
  • The Project Code 7570 in Al Reem Island
  • The Contract No. 3/1/180/1-2
  • The Contract No. 3/1/180/1-2
  • The Grand Mosque- Abu Dhabi
  • The TRIP Contract 997 (East Road Widening)
  • Supply of Tunnel Light Fittings and Control Systems for the Contract No. 5001
  • Supply of Tunnel Light Fittings and Control systems for the Contract No. 2. Al
  • Salam Street
  • Supply of LED Street Lighting for the Contract No.2 Link Road
  • The Corniche road Developments TRIP Contract 2016


  • Electrical accessories for the Corniche road Developments TRIP Contract 2016
  • The Baynounah Street Developments TRIP Contract 4004
  • The Widening & Improvement of West Road/ Mussafah Road TRIPContract 2002
  • The TRIP Contract 997 (East Road Widening)
  • The Corniche road Developments TRIP Contract 2016
  • AL Reem Island Development package –1
  • Infrastructure works at Rawadhat Abu Dhabi
  • Al Reem Island Development – Light fixtures for the Substation building.
  • Bridge Interchange at RUWAIS
  • ADSSC Contract No.G100
  • Al Reem Island Infrastructure Regional Roads and Utilities Package
  • Sadiyat Link Work
Copyright (c)Gems systems L.LC. com All rights reserved. Design by http:// www.redbacksystem.com.